{"id":10631,"date":"2018-02-13T12:27:17","date_gmt":"2018-02-13T11:27:17","guid":{"rendered":"https:\/\/www.schiedel.com\/uk\/?p=10631"},"modified":"2022-01-27T14:28:09","modified_gmt":"2022-01-27T13:28:09","slug":"flue-system-at-newcastle-civic-centre","status":"publish","type":"post","link":"https:\/\/www.schiedel.com\/uk\/flue-system-at-newcastle-civic-centre\/","title":{"rendered":"Flue System at Newcastle Civic Centre"},"content":{"rendered":"
Schiedel installed a temporary flue system to keep the Civic Centre heated up during the Winter months, as part of an ongoing project.<\/strong><\/p>\n The existing, ageing brick flue was removed, while the Schiedel Chimney System was installed to replace it.<\/p>\n The system installed was ICS, which is\u00a0a twin wall flue manufactured with a stainless steel liner and stainless steel case. It is insulated with a 25mm thick high-density (128kg\/m\u00b3) superwool blanket.<\/p>\n ICS features include:<\/p>\n Schiedel arranged the delivery, offloading and erection of the boiler flue system. There were 3 x\u00a0Babcock Wanson<\/a> boilers at different kW power output ranges. The \u00d8250mm flues connected from the flange adaptor, to turn through 90\u00b0and rise vertically to enter 87\u00b0 bends. The flues then travelled at an angle of 3\u00b0 to connect into swept tees in the main existing header.<\/p>\n All systems were supported horizontally by means of ceiling hangers and vertically by means of adjustable wall brackets.<\/p>\n\n