Back to Overview

Hinxton Hall Conference Centre

  • Non-Residential
  • Carried out in United Kingdom in 2023
  • Product(s) used:  ICS 5000
  • Renovation
  • Education/ School
  • Generators
  • Energy Centre
We supplied and installed five ICS 5000 Ø350 system chimneys to serve the backup generator sets at the Research Centre. A key challenge was to minimize their visual impact on the building's aesthetics. To achieve this, the framework and outer casing of the chimneys were soda blasted, a process that allowed them to blend seamlessly with the surrounding structure, ensuring both functionality and visual harmony with the existing architecture.

Challenge

We supplied and installed five ICS5000 twin-wall flues for the building's diesel generators. The flues were routed horizontally from two plant rooms on opposite sides of the building before connecting to vertical risers. The project required careful routing through both the exterior wall and a bull-nosed overhang. To minimize the visual impact of the flues, we applied a soda blasting treatment to help them blend seamlessly with the building's architecture.

Solution

We selected the ICS5000 System Chimney for this project due to its engineered precision joints and proven track record. This solution, with a designation of T600 H1 D V3, was chosen for its ease of installation and reliability. To ensure the chimneys would blend seamlessly into the environment, they were soda blasted to achieve a matte, non-reflective finish. The final installation at Hinxton Hall is a testament to how Schiedel products can be adapted for diverse architectural needs.

The Customer

Hinxton Hall is the home of the prestigious Wellcome Trust Genome Campus, a leading research and educational center dedicated to advancing genomics. This campus focuses on unlocking the mysteries of the human genome—the very blueprint of life. The groundbreaking research conducted here is vital to uncovering the genetic roots of many illnesses that resist current treatments, and it is actively shaping the future of medicine and healthcare.

Other Projects

United Kingdom

Non-Residential

Gartnavel Hospital

To ensure uninterrupted backup power for Gartnavel General Hospital, the project involved the delivery and installation of four 450 mm diameter chimneys. These chimneys supply the generators and were connected to the containerized engine rooms via a tailor-made frame construction. This clever design allowed the horizontal pipes to be stacked in proper, parallel pairs. This precise arrangement was maintained right up to the main building. From there, the chimneys continued horizontally before making a decisive vertical curve to finally reach an impressive height of 40 meters.

READ MORE

United Kingdom

Non-Residential

Glasgow Royal Infirmary

Supply and Installation of 6 x Ø500 System Chimneys serving FG Wilson Gen Sets providing back up power to the Hospital. The exhausts needed to run horizontally above the entrance to the hotel before rising vertically to reach the roof of the energy centre, from where a further extended horizontal run was required with support before turning into th e main vertical runs supported from the existing concrete stack.

READ MORE

United Kingdom

Non-Residential

Lochaber High School

Supply and installation of 3 x Ø250 system chimneys designed to serve Viessmann Vitoplex 200 condensing boilers, along with 1 x Ø350 system chimney catering to a Viessmann Kob Pyrot biomass boiler. The chimneys are configured to run horizontally from the plant room, transitioning seamlessly into an aluminum-clad windshield that rises vertically through the curved roof of the Energy Centre plant room, ensuring efficiency and durability.

READ MORE