{"id":12246,"date":"2018-05-30T13:51:59","date_gmt":"2018-05-30T11:51:59","guid":{"rendered":"https:\/\/www.schiedel.com\/ie\/?p=12246"},"modified":"2022-06-01T12:01:10","modified_gmt":"2022-06-01T10:01:10","slug":"flue-for-a-distribution-centre-in-amesbury","status":"publish","type":"post","link":"https:\/\/www.schiedel.com\/ie\/flue-for-a-distribution-centre-in-amesbury\/","title":{"rendered":"Flue for a Distribution Centre in Amesbury"},"content":{"rendered":"
Highly efficient ICS 5000 installation.<\/strong><\/p>\n Schiedel undertook the installation of a generator exhaust system with Dieselec Thistle<\/a> for TJ Morris<\/a>\u00a0(who trade as Home Bargains), in Amesbury, just a stones throw from Stonehenge \ud83d\ude09<\/p>\n The ICS 5000 system was used and from the generator silencer flange, the \u00d8500mm flue turned through 180\u00b0 to then ran horizontally approx. 9m to connect to a 135\u00b0 tee. The flue then rose vertically for approx. 11m to termination with the offset around the building overhang.<\/p>\n At the base of the system was a 135\u00b0 Tee, below which was positioned a support plate assembly with tee cap and a drain connection. The\u00a0system terminated above the roof and was finished with a tapered terminal.<\/p>\n All systems were horizontally supported by means of ceiling hangers and vertically by means of adjustable wall brackets and support plates.<\/p>\n