{"id":7530,"date":"2016-10-13T12:13:23","date_gmt":"2016-10-13T10:13:23","guid":{"rendered":"https:\/\/www.schiedel.com\/ie\/?p=7530"},"modified":"2022-06-01T12:01:22","modified_gmt":"2022-06-01T10:01:22","slug":"the-construction-of-the-flueing-system-at-darlington-memorial-hospital","status":"publish","type":"post","link":"https:\/\/www.schiedel.com\/ie\/the-construction-of-the-flueing-system-at-darlington-memorial-hospital\/","title":{"rendered":"The construction of the flueing system at Darlington Memorial Hospital"},"content":{"rendered":"
The primary heating services at Darlington Memorial Hospital were upgraded to create a new state-of-the-art energy centre which will reduce energy usage and deliver a significant reduction in the trust\u2019s carbon emissions. This will help to fulfil the Trust\u2019s goal of being a sustainable hospital. The energy centre has three Cummins Generators, two Byworth Steam Boilers, a Byworth LPHW Boiler and space for a future CHP boiler.<\/p>\n