{"id":9445,"date":"2017-06-26T11:32:56","date_gmt":"2017-06-26T09:32:56","guid":{"rendered":"https:\/\/www.schiedel.com\/ie\/?p=9445\/"},"modified":"2022-08-24T16:16:47","modified_gmt":"2022-08-24T14:16:47","slug":"exhaust-flue-for-milton-keynes-waste-recovery-park","status":"publish","type":"post","link":"https:\/\/www.schiedel.com\/ie\/exhaust-flue-for-milton-keynes-waste-recovery-park\/","title":{"rendered":"Exhaust Flue for Milton Keynes Waste Recovery Park"},"content":{"rendered":"
[vc_row][vc_column][vc_column_text]\n
\n

Exhaust Flue for Milton Keynes Waste Recovery Park<\/h1>\n

Schiedel recently completed the exhaust flue for Milton Keynes Recovery Park, which was designed by Amey<\/a>,\u00a0working in partnership with Milton Keynes Council to design, build and operate the state-of-the-art facility to treat general household waste from across the borough.<\/strong><\/p>\n

Schiedel supplied the ICS 5000<\/a> flue, which is a twin wall flue with a stainless steel liner and stainless steel case. It is insulated with a 50mm<\/strong> thick high-density superwool blanket and is designed to accommodate pressures up to 5000pa.<\/p>\n

The project saw Schiedel supply and install the flue, which ran horizontally off the generator, before turning through 90\u00b0, including drain point, and rising vertically with a 30\u00b0 offset for approximately 22m to termination.<\/p>\n<\/div>\n

The project formed a part of the Milton Keynes Waste Recovery Park<\/a>, which comprises technologies such as a mechanical treatment system, which will sort the waste, extracting\u00a0at least 9% for recycling. Also, food and biodegradable items will be extracted and processed in a fully enclosed anaerobic digester to generate renewable energy. The remaining non-recyclable and non-compostable material will be fuel for an Advanced Thermal Treatment plant. This transforms the material into a combustible gas, to generate steam and subsequently electricity in a turbine.<\/p>\n

This will\u00a0cut the amount of rubbish sent to landfill to around 3%.<\/strong><\/p>\n

This is yet another major project, working with the renowned company, Amey<\/a>, who have 100 years experience, and have a team of 20,000 across four continents, supplying consulting and infrastructure support. This shows that such renowned and established companies have confidence in\u00a0<\/em>Schiedel’s range of commercial products.<\/em><\/p>\n

For more details on our products and services, please browse the website, take a look at our social channels, contact us via email<\/a> or call 0191 4161150.<\/strong><\/em>[\/vc_column_text][\/vc_column][\/vc_row][vc_row][vc_column][vc_column_text css=”.vc_custom_1661350607875{margin-bottom: 0px !important;}”]\n

Get in touch<\/h2>\n

Contact us today to see how we can help in similar projects<\/p>\n

\n